The Isle of Man Railway
was operating in two section for 2003 due to pipeleline works along the
railway. Douglas to Santon was operated normally with egines running
round using the loop at Santon, but Port Erin to Port St Mary was operated
on a 'push-pull' basis by 'Caledonia' as there isn't a run round loop at
Port St Mary.
April 2003
  
May 2003
     
     
    
June 2003

July 2003
    
     
August 2003
   
September 2003

October 2003
 
|